Skip to content
Monday – Friday: 7 a.m. – 5 p.m.(228) 555-0100

Septic and wastewater systems on the Mississippi Gulf Coast

A septic system designed for your ground, not a catalog

Sandy lots, clay yards, high water tables and flood zones each call for a different system. We test the soil first, show you the options in plain words, and put the price in writing before anyone digs.

  • Soil tested before any design
  • Written plan and price before digging
  • Licensed installer, number in the footer
A gravel county road crossing fields covered in standing water, with a house and bare trees beside the flood

Three systems

Septic types in plain words

The soil test and the lot decide which one fits. Here is how each works, and the first signs that one is in trouble.

Septic types in plain words
First signs of troubleHow it works, and where it fits
Conventional gravity systemFirst signs of troubleSlow drains in every fixture, gurgling pipes, a sewage smell outdoors, or a wet strip of bright green grass over the field.How it works, and where it fitsA tank settles out the solids, and clear water flows by gravity into buried trenches. It fits well-drained soil with room between the trenches and the water table.
Aerobic treatment unitFirst signs of troubleAn alarm light or buzzer, an air pump that has gone quiet, a tripped breaker at the panel, or standing water around the spray heads.How it works, and where it fitsAn air pump feeds the tank so bacteria break waste down further before the water is sprayed or dripped out. It fits small lots and poor soil, where a lot of treatment has to happen in a little space.
Mound systemFirst signs of troubleSeepage on the sides of the mound, a pump alarm, ponding at its base, or soft or sunken spots on top.How it works, and where it fitsA raised bed of clean sand sits above the natural ground and is fed by a pump from the tank. It fits a high water table or shallow soil, common near the coast.

What we do

Design, install and repair, from one crew

An independent partner does the soil test. We do the rest, and we are the ones you call afterward.

  • Soil test and site plan

    Our testing partner digs and reads the soil. We then place the tank and field around trees, wells, slopes and flood lines.

  • New system install

    Conventional, aerobic or mound, built to the permitted plan and inspected before it is covered.

  • Drain field repair and replacement

    Cut roots, crushed pipe, a field that has gone soft or flooded: we find what failed before we price a new one.

  • Tank pumping and inspection

    Pumping, baffle and filter checks, and a written note of what we found, for your records or a home sale.

  • Aerobic unit service

    Air pump, alarm, float and spray-head checks, on the schedule your system calls for.

  • Pumps, alarms and lids

    Effluent pumps, float switches, alarm panels and riser lids, replaced so the next pump-out needs no digging.

Before any design

The soil test decides the system

Quyen Vo, our independent soil evaluator, digs test holes and reads the soil layers and the water table. We pick no system until her report is in.

Coastal ground is mostly sand over a shallow water table, with clay pockets inland. Sand drains fast and treats little. Clay drains slowly. A high water table leaves no room for either. Her report is what the permit application and our design both start from.

  • Test holes dug where the field would go

  • Soil layers and color read on site

  • Water table depth noted

  • A written report you keep

Quyen Vo

Independent soil evaluator, our testing partner

A hand pump standing in pale sandy ground at the edge of a green field

How a job runs

From first call to a working system

  1. 01

    Step 1: Site visit

    We walk the lot, ask what is on it now, and listen to what is going wrong or what you plan to build.

  2. 02

    Step 2: Soil test

    Our partner tests the soil. You get her written report, whether or not you hire us.

  3. 03

    Step 3: Plan and permit

    We draw the system, explain the options and send a written price. After you sign, we prepare the permit paperwork for the county.

  4. 04

    Step 4: Install and inspect

    The crew digs, sets and connects the system. The permit inspection happens before we backfill.

  5. 05

    Step 5: Your care schedule

    You get pump dates, filter cleaning and a list of what never goes down the drain, on one page.

From homeowners and builders

What the soil report changed

“The soil report said the water table was too high for the plan I had in mind. They showed me a mound instead and explained why. Nobody had made the choice that clear before.”

Wendy T.Homeowner, Long Beach

“Our field had been wet every spring. They dug it up, showed me the crushed pipe, and wrote down what the repair would cost before they started.”

Johnnie B.Homeowner, Saucier

“I send every new lot to them. The plan and the permit paperwork arrive together, which keeps my framing schedule honest.”

Santiago P.Builder, Diamondhead

Sample reviews.

On the record

Licenses and insurance

The license number is in the footer of every page. Ask us for the insurance certificate and we send it.

  • Licenses

    • Onsite wastewater installer

      MS Lic. 000000 · Mississippi State Department of Health

      Needed to install or repair a septic system

  • Insurance

    • General liability

      Your insurance carrier

      Certificate on request

Short answers

Questions about septic systems

How often should I pump my septic tank?

Most household tanks need pumping every 3 to 5 years. A bigger household, a garbage disposal or a small tank shortens that. We give you a date once we have seen your tank.

What should never go down the drain?

Wipes, even the ones sold as flushable. Also grease, paint, solvents, medicine, cat litter and coffee grounds. Large amounts of bleach or drain cleaner hurt the bacteria the tank depends on.

Is my system failing, or just full?

Slow drains in every fixture, gurgling pipes, a sewage smell outside and a wet green strip over the field are the signs. A pump-out answers part of it. A camera and a field check answer the rest.

Can I use my system after a flood?

Wait until the water around the tank and field has gone down. A flooded system can back up, and a tank can float if it is pumped while the ground is saturated. Call us before you pump.

Do you handle the permit?

We prepare the permit paperwork for your county after you sign the plan. The county sets its own fees and inspection schedule.

What does it cost?

It depends on the soil, the system and the lot. The pricing page explains what moves the number, and you get it in writing before any work starts.

Tell us about the property

A site visit is how we start. Tell us what is happening or what you plan to build, and we call you back.

Hours
Monday – FridayToday
7 a.m. – 5 p.m.
SaturdayToday
8 a.m. – noon

Sewage coming up in the house? Stop using water and call (228) 555-0100.